Last of the Interior Right Tank Ribs

June 26, 2011

Prev | Next

Well, between a puppy run, mowing the lawn, and a run to Lowe’s to get some house-related stuff, I managed to fit in a good three hours on the right tank.

First up, I unfurled some of the -4 tubing that’s provided (the tape said the roll from Vans was 19’) and tried to bend it as straight as I could. I notice in other’s pictures, it looks perfectly straight, but I couldn’t get mine that good. When you actually see a picture of it, let me know if you think it’s straigh.

Anyway, slid it in the installed ribs (after putting in some snap bushings), and cut it about an inch too long. Right before I install the last rib for good, I’ll final cut this, and flare appropriately.

Today’s goal, though, was to get ribs #2 and #4 done.

Here is rib #4 after being lathered in proseal, clecoed in, rivets inserted and taped over.

I like this part, because it means I’m about to set some rivets.

Here’s a shot from the other side showing some fillets. On this rib, I did the fillets before I set any rivets. Hopefully, getting those done now will prevent some of the proseal from getting on my bucking bar.

Nice fillets.

After banging away for a little, here are the rivets on the top of the skin.

Oh man, I hope it’s easy to clean off that proseal later.

…and the bottom of rib #4.

Before starting in on rib #2, I need to fabricate a little trap door. Basically, it will all fuel to flow from outboard to inboard, but when I roll one way or the other, the door will close and not allow fuel back outboard. (Fuel will still trickle out through some of the smaller holes, but enough should stay in the first bay to prevent fuel starvation for the short time it will take me to roll back upright.

The anti-hangup strips can be added later, but the trap door would be hard to do later.

I’m making the door from the bottom of the picture.

So, I found some extra hinge stock laying around, and cut it to make it look like the plans.

Hinge stock.

Then, I bent the hinge pin and triangle piece (which stops the door from opening all the way).

After some drilling, deburring, and dimpling, I set some flush rivets (so the door would close) in the bottom half.

3 rivets here.

Since I didn’t want to up the rivet size just so I could use a universal head rivet, I drilled the upper half of the hinge along with the rib to #40, then deburred and dimpled both.

3 more here. Trap door closed…

…trap door open.

Then, after having a HECK of a time getting the inboard rib clecoed in place (because you want to have the rib on either side of the one you are working on installed to firm everything up while you are riveting), I realized I was trying to cleco a dimpled skin into an undimpled rib.

Dumb.

So, deburred, dimpled, then tried again.

Much better. Here’s a shot after getting rib #2 cleaned, lathered up, clecoed, rivets inserted, and ready to rivet.

It actually wasn’t too hot out today. Having the garage door open was nice, although I’m pretty sure the neighbors think I’m crazy with the hearing protection, respirator, and gloves.

Speaking of gloves. This is the last one.

Don’t mess up, you only get one shot at this one.

Okay, half the rivets set, insert new (cleaned) rivets, move the tape…

The grass on the other side of the driveway is nice healthy grass, I promise.

All done on the top of #2.

Bottom is done, too.

After taking a short break (to breathe fresh, instead of respirated, air), I pulled off the blue vinyl from inside the tank. This worked perfectly for me, even though some guys on VAF were skeptical and insisted everyone use electrical tape.

Baloney! (Is that how you spell that? I’m not talking about the meat “bologna,” I’m talking about the “you’re full of it” exclamation.)

Well, I didn’t pull the first bay’s vinyl off yet. I’ll wait till the inboard rib is attached.

3.0 hours. 34 rivets on each of the ribs, plus 6 rivets for the trap door. None drilled out. I am a riveting all-star. (Only one rivet drilled out in the last 8 building sessions. Nice.)

Prev | Next


Inboard Tank Attach Bracket

June 6, 2011

Prev | Next

Well, my order came in from Van’s today. Here are the goods.

It's like Christmas, but in June.

First up, a W-408-1R, NOTCHED NOSE RIB. Turns out, I ruined the other one by not making sure it was all lined up prior to drilling. I have a good idea on how to make this one work out, so stay tuned.

Also included in this order, my flop tubes, and some snap bushings, which I needed to order due to all of the holes I drilled in the wing ribs. (Oh man, now I want a steak.)

Leading edge rib, flop tubes, and snap bushings.

Then, the proseal (black death!), fuel tank leak test kit, and 25′ of black corrugated tubing that should fit nicely in the holes I drilled in the ribs (see steaky link above).

Black tubing, proseal, and test kit.

Even though I REALLY WANTED to break out the proseal and start slathering it all over my workbench, airplane, hands, clothes, and face, I decided to wait until my popsicle sticks and syringes come in from amazon.

So tonight, I decided to work on the right inboard attach bracket.

After studying the plans, I grabbed the AA6…I’m not going to type out the part number. See the picture below.

Yup. That's it.

(Insert silence here where I tried for 10 minutes to figure out what R1 is.)

I’m really sorry to admit this, but I started scouring the internet. Googled “VAF R1 TANK ATTACH BRACKET” and “R1 NOTE DWG 16A VANS RV-7.”

To no avail.

Then, someone’s build site (can’t remember who), admitted that they spent 10 minutes and some google searches trying to find out what the R1 stood for before they realized that it wasn’t a note, it was RADIUS=1 inch.

Duh.

Okay, I’ve got some lines drawn.

Whose cute toes are those?

I think that is T-410 on the top of the picture. I used that to trace mirror images on the 2" side.

Then, I pulled a can of OFF from the shelf and used it to make a 1" radius circle. Then, connected the tangents after drawing a 1/2" line along each side of the bottom. (The drawing is half scale, and it was 1.4" on the drawing.)

After some sawing, I for some reason lost interest and broke out some of the snap bushings.

Two of the smaller size (SB375-4), and one of the bigger size (SB437-4).

Sweet. These will work perfectly.

Nice.

Umm, who took this redundant picture?

Okay, back to sawing.

Hmm. This turned out to be annoying with the jigsaw. Maybe I need a bandsaw.

Done.

Insert about 30 minutes of deburring on the scotchbrite wheel….

Deburred.

So, then I put it in the nose of the inboard rib, and admired how nicely it fit. (Actually, it still needs a little trimming around the edges.)

Looks good.

Okay, I didn’t do a good job of taking pictures here, but basically, I drew a line 1 and 1/16″ back from the tip of the rib, and then drew a line parallel to the front edge, but 2 diameters of the final rivet size (1/8″) away.

Here's where I got the 1 and 1/16" from.

Then, I marked and drilled 5 of the 6 rivet holes, along with the center hole, which is the pilot hole for the 9/16″ hole that the flop tube fitting will fit through.

confused?

Here's a better picture. 5 plus the pilot drilled, and I've laid in the AN nut to see where I can put the sixth (marked) without rivet head interference.

This is me trying to figure out what size hole I’ll need for the fitting.

0.563? What fraction gives me 0.563?

Obviously 8/16″ is 0.5 and 5/8″ is 0.625. Let’s try 9 divided by 16.

Wuhoo!

Apparently I don’t have a 9/16″ bit, but I did work my way up to 1/2″ and then lay in some AN470AD4-7 rivets so I could show you my good spacing.

How's it look?

Here's the other side.

1.5 hours. Still need a 9/16″ bit, but that won’t stop me from getting into the tank stiffeners, drain flange, and filler cap soon.

I’m actually looking forward to it. Maybe this week.

Prev | Next