Primed 3 More Main Ribs, Now 7 Done

January 8, 2011

Prev | Next

Today, I worked on ribs R5, R6, and R7. (Remember, this isn’t Vans’ number scheme, this is mine.)

First, I negotiated a larger cleco holder from the girlfriend.  I used to have two containers the size of the left one. Now, I have plenty of room for my clecos. (Until, of course, I have to order 200 more…)

I could fill the one on the right up if I didn't have all my clecoes in the leading edges.

Okay, back to the ribs.

The extra two on the right side needed a little touch-up from some water contamination prior to the first round of priming. Gotta let those suckers dry before spraying.

One hour to prep and prime those 3 ribs. I’m halfway done with the ribs on the right wing. I think I may start riveting the ribs to the main spar as I go to break up the monotony. We’ll see.

Prev | Next


Finished Left Rear Spar

December 12, 2010

Prev | Next

Well, I know I’ve been bombarding you with new posts lately (not!), but I did get a fair amount done today. As you can tell from the title of the post, I finished the left rear spar.

More importantly, I made an investment to my health this week.

I present to you…(triumphant music)…a heater.

Ta-da!

This is a pretty sweet heater. It’s small, only cost $20, and by no means will it heat the garage, BUT, the garage is no longer (literally) freezing, and I can work in front of the workbench comfortably for a whole day. It will provide me with two heat settings and has a little fan in it. I set it in the corner of the workbench (as pictured above), and after about 5 minutes, I have to turn it down to the low setting. After about ten minutes, it is pretty comfortable where I’m standing in front of my workbench. And, now that I think about it, it does take the chill off the rest of the garage. Even for the one day I’ve really used it while I was finishing the floors, it has totally earned its cost back.

Okay, back to the airplane. I finally found my stepdrill, and made a couple holes in my W-707E.

Step-drill to the rescue. Had I planned this a little better, I would have done three smaller holes.

I clecoed W-707E back onto the rear spar and flipped it over to use the dremel to clean out the rest of the aileron pushrod hole.

I'm about to flip the spar over and use the dremel to clean up the hole.

I'm not totally done here, but you get the idea.

After that, I moved on to dimpling the reinforcement plates where I won’t be able to dimple them later.

4 #30 dimples along the left (outboard) edge, and #40 dimples along the top flange.

I also dimpled the flange of the rear spar where the reinforcement plates will go.

Then, after a little more scuffing and cleaning, I shot primer on the spar.

I love this color. Makes me happy.

And the left W-707E and W-707F.

After a couple hours inside while the primer dried, I came back out and studied the rivet callouts.

Looks like I can set 7 rivets here right now. All size "square," which is AN470AD4-8.

5 of the 7 set. Nice shop heads, huh?

I moved along the reinforcement fork, using clecos as indicators not to rivet certain holes yet.

I chose to put the shop heads on the aft side of the rivet (these are manufactured heads). I like shop heads, and it makes inspection easier.

Moving outboard, I studied the same callout for the middle reinforcement plate, or W-707E.

Looks like I can set five here, of size "upside down triangle," which are AN470AD4-4.

Manufactured heads

Shop heads.

And repeat with the outboard reinforcement plate.

6 here, I think. More upside-down triangles.

Manufactured heads.

Shop heads.

Then, I couldn’t help but grab the right spar and put them both up on the workbench.

It feels good to have both rear spars done.

Look at the difference in paint color. Left spar (just finished) is on the right.

More difference in paint color.

Anyway, all the rivets were symmetrical from right side to left side, which doesn’t mean I’m correct, it just means that if I did make any mistakes, I made them twice!

Now, all that’s left on the spars is to finish up the left tiedown. Then, I really need to make some wing stands and finish up some rib deburring.

Tonight was a good night. 56 rivets, and it feels really good to get something big put together.

Prev | Next

Onward and upward!


Prepping and Priming Some Rear Spar Components

November 20, 2010

Prev | Next

Oh man, I’m furious. I just spent some time doing a huge writeup for this post, and when I clicked, “Post”, it deleted all of my text.

Grrr.

I’ll try to rewrite it, but it is going to have a little bit of an annoying tone.

Anyway, I managed to get out in the shop today for a little. I had previously gotten all of the doubler plates and reinforcement forks matchdrilled to the spar, so today was all about prepping and priming.

Here’s W-707F, which sits on the back side of the left spar. I’ve deburred and scuffed it; all I need to do now is dimpled the outboard holes in preparation for attaching it to the spar and outboardmost rib.

I love scuffed parts. They hide my fingerprints.

Here’s W-707E, which is the doubler plate that sits on the aft side of the rear spar, right in the middle. I’ve marked the cutout for the aileron push tube. Where’s that step drill?

Yup, here you can see my fingerprints.

I started looking around for my stepdrill. I spent good money on that stepdrill, but I couldn’t find it anywhere. On the workbench, under the workbench, on the floor, in some other shelves. I thought maybe I put it in some other tool’s case, so I got out the dremel tool, multifunction tool, jig saw, circular saw, etc. Nothing.

I even accused the girlfriend of selling it on the black market to fund an bottle of Opus One. She insisted that while she thought about it, she didn’t.

I remember putting it in this old small cabinet of drawers (that my dad gave me when I graduated college…thanks, dad!). I spent about 30 minutes just pulling out each one of these drawers, looking for my step-drill. Grrr.

After continuing to work on the airplane (angrily) for another 30 minutes, I finally found it when I came back to the drawers and opened them with my other hand. Apparently my sausage fingers (they’re not, I promise…I’m just mad) blocked my view of the stepdrill, which was right behind the lip of the VERY FIRST DRAWER.

Ugh.

Anyway. Back to the rear spar. This is the forward side of the left spar, outboard end. I’ve deburred the edges of the whole spar, and now I’m deburring all of the holes I drilled.

I always scuff the areas where there are holes I've drilled and deburred. Helps me keep the "did I do this already" time to a minimum.

Oh yeah, I managed to get a couple parts primed today. Like riveting, I always feel like it is a productive day if I can prime some things.

You can also see my primer of choice, Napa 7220.

Here’s the other side of those pieces (after plenty of drying time).

I like priming.

Back to the spar, more deburring holes and scuffing.

I'll finish scuffing the whole spar when I get closer to priming.

This is the middle of the rear spar, around the aileron pushtube hole. More deburring and scuffing.

Jeesh, there are fingerprints everywhere.

Finally, I brought the two primed parts back inside.

Primed parts on the workbench always means we're getting close to riveting. Wuhoo!

After this was about when I finally found my step-drill. I was too angry at myself to keep going, so I headed inside to some grilled chicken, jasmine rice, and creamed corn. Mmmm.

1.5 hours

Prev | Next


Right Rear Spar Doubler and Reinforcement Fork

September 8, 2010

Prev | Next

The next step on the rear spars is to trip the W-707D and W-707G Rear Spar Doubler and Reinforcement Fork to size.

These parts are shared between the RV-7 and RV-8 (and maybe more, I’m not sure), and must be trimmed if you are building the -7.

This is a tricky trim job, though, because many people have future troubles with drilling the rear spar to the fuselage and maintaining the required edge distance for the hole in THESE PIECES.

It would be best not to overtrim, and leave even less margin than what is already there.

The plans and construction manual both point to Dwg 38, which is of course not included as a full-scale sheet in the wing kit, so I got out my preview plans and started staring.

Even though I’m only working on the right side for now (will bring the left wing up to the right side’s progress when I get the replacement spar from vans), I’m going to do both sides of this now while I’m all mind-prepped to do it.

A snapshot of the applicable portion of Dwg 38. Looks like I should start measuring and marking. (No cutting yet, though!)

Keep in mind here that you measure from the edge you are about to start cutting away, so once you start cutting there is no double-checking your measurements.

Of course, I'm being dumb by doing the right side first (left is shown in the drawing above.)

Here are both lines drawn, measured, double-checked etc. It's still all making sense, so that is a good thing.

The bottom cut off. (For you OCD types, I realize I should have made the other cut first, which would have been a little less cutting overall, but oh well).

I decided to cleco the two smaller pieces together first, then transfer the lines to the bigger forks, and do those separately.

Ready to transfer the lines.

Of course, I didn’t get any in-progress shots of the fork cutting, but it went well. I then clecoed the left and right assemblies together and grabbed this shot after a few passes on the scotchbrite wheel.

At the end of this project, I am going to go back and count how many toes ended up in all the pictures. Here's...{counting}...6 more.

After some time on the scotchbrite wheel, I have two ready-to-cleco parts.

Nice and scuffed.

Then, I clecoed the doubler plate and reinforcement fork to the right rear spar and started matchdrilling.

Matchdrilling.

I had a hard time deciding if I should enlarge some of the rib attachment holes in the fork and doubler plate to final size, and I decided I would. I couldn’t find anyone who said it would be a bad idea, and now I’ll get to deburr and prime all of the rear spar components.

I did leave the majority of the rear spar “future” holes alone, though. I guess per the directions (indirectly, just in step order), I’ll drill those after priming the rear spar.

Here's a picture from the backside (actually, front side) of the spar.

Of course, I was careful to mark and enlarge to #40 the flange holes that need to be dimpled now (the reinforcement fork prevents the female side of the dimple die from getting behind these holes).

I didn't actually dimple, though. I need to leave something for tomorrow.

After taking everything apart and deburring holes, I have a few pieces ready for priming, and a rear spar with some remaining deburring before priming.

I scuffed the rear spar where I had already drilled and deburred to help remind myself what I have left to deburr.

Today’s hour was a good one; a few things ready to prime, and just one deburring and priming session away from being able to rivet the rear spar assembly together.

I need to go buy some more Napa 7220 Self-Etching Primer.

Prev | Next


Started working on the Elevator Tab

June 20, 2010

Prev | Next

After some more days of not doing anything, I managed to make it out to the Pilots N Paws fly-in today. It was good motivation for working on the airplane.

Anyway, I’ve drilled the left elevator skin to the skeleton, and the next step is really to take everything apart, deburr, dimple, countersink, prep, prime and assemble…

BUT…

I have some things that need to be done first. Mostly, the directions want you to bend the elevator tab “ears.” Well, I don’t think I want to go the bent route. Here’s what I am worried about. I don’t think anyone would really notice, but I don’t love the way this looks.

Bent trim tab ears. I think I'm going to cut mine off and make little ribs.

I think with some work, I could make them look like this, but given how finished these surfaces are, I don’t know if they started as bent ears or riblets.

WHOA! This is awesome. This guy really finished this joint up nicely. Everybody be jealous.

Finally, I found a really nice riblets version. I like this, and this is what I am going to be aiming for (although I am going to try to use solid rivets.

Great finish on the cut-instead-of-bend tab ears. I'm going to strive to make mine like this.

Anyway, I also think cutting the ears off (not bent down in the way) will allow me to use solid rivets in the blind-rivet locations on the top and bottom of the elevator (outboard trim spar rivets). We’ll see.

First step is to get the skeleton re-clecoed in the skin.

The trim spar and the inboard rib.

Van’s wants you to countersink either piece for flush rivets (not for any real flush reason…I think they need to be #40 size holes, and they don’t give you any universal head AN470AD3 rivets). Anyway, per standard practice, I dimpled both.

Dimpled instead of countersunk.

After clecoing together the skin, I am ready to start the headscratching with the tab. Let’s find the tab spar.

There it is.

Let’s go ahead and cut off these tabs. After careful measuring and marking, I’m ready to put blade to metal.

Inboard side. I'm nervous about chopping these off.

Outboard. (see how I lined up the line parallel to the flat portion near the top and to the left of the relief hole near the bottom? This doesn't work. Read on to find out why.

After a quick snip (not too close to my final line) I removed the vinyl from the interior of the skin in preparation for using a file and scotchbrite pad to clean everything up.

Devinling before finishing those cuts.

After working carefully with a file and edge finisher…

Looks good.

Before I really finalize things, I’d like to get my tab placement set up. First, I tried using this extra piece of rudder stiffener.

It worked okay, but I later switched to something a little longer.

After some moving around and fiddling, I re-read the directions, which tell you to bend the elevator ears down along a bend line that is perpendicular to the hinge line. Well, that means that the cut lines should be perpendicular, too. Of course, like I mentioned before, my original outboard line wasn’t perpendicular. All that file work for nothing.

I drew new lines (one on top of the other, ignoring the needed clearance).

Drawing new, perpendicular lines.

Then, I made a “pretty close” cut with the snips. I’ll need to really clean this up, as well as move the line to the left for clearance purposes (I’ll wait until the hinges are drilled to really see what I need. (The instructions call for 3/32″, but that is for the blind rivet head clearance that I won’t have to worry about.)

Pretty close, but still needs trimming and finishing.

Next, I moved back to the tab. Here’s my new line.

I'm bummed because the upper part of the tab, factory provided, is not perpendicular to the hinge line. That means there will be a slight angle there. Bummer.

After getting those refinished, I got the tab mocked up. I kind of worked backward. I want to use the inboard edge and the trailing edge to get placement, then verify I have adequate clearance on the outboard edge and between the tab and elevator for the hinge (there are some hinge dimensions on the plans). I think I’ll have plenty of room.

This looks good, but I'll have to keep trimming that outboard edge.

Here's a closeup. You can see the edge near the top of the tab is angled a little left. This is how it comes from the factory. The marker line and aft portion of the tab are both perfectly perpendicular to the hinge line (line through the center of the rivet holes).

Later this week, I’ll work on getting this perfect, then tackling the riblets that need to be constructed before doing any more work with finishing the skin.

Prev | Next


More Drilling, Deburring, Scuffing and Dimpling

May 9, 2010

Prev | Next

After we got back from my first Pilots N Paws rescue, I was excited to keep working on the airplane.

I needed to start on the tip rib and counterbalance rib, so I needed to get the holes in the counterbalance to final size (#12, for a An509 screw).

I had some trouble awhile back with drilling the counterbalance holes to final size, and I don’t have any boelube, but i figured any lubrication would work better than none, so I poured some air tool oil into the holes and tried again.

This time, it worked much better. (I still got stuck a few times, but I didn’t come to a grinding halt like I did last time.)

Here's the counterbalance after drilling to #12.

I clecoed the counterbalance skin back onto these two ribs, inserted the counterbalance, and matchdrilled through those to make these holes in the ribs.

Nice job with the blurry picture, right?

Next up, deburring.

There's my trusty deburring bit.

Then scuffing.

Bottom rib (counterbalance rib) is scuffed.

After deburring and scuffing the tip rib, I dimpled all but the last 2 holes on the top and bottom of the rib.

The two non-dimpled holes are not shown here. I'll have to get the countersunk steel plate out to get those.

Next, I clecoed the counterbalance skin on the right elevator skin and marked with a permanent marker where I wanted to scuff and prime. Some of the edges here have to be broken to make the skins seam from spar to coutnerbalance skin a little smoother. More in a later post.

Above this line, the right elevator skin overlaps, and will need a coat of primer.

Then, out with the trusty blue tape.

Taped and ready for scuffing.

Then, I pulled out my #8 dimple dies (don’t have #10 dies, which are the correct dies for a #12 hole and AN509 screw) and dimpled the counterbalance skin. The countersinks on the right are the correct size. I need to figure out how to dimple the skin on the left a little more.

After this shot was taken, I screwed the correct screws into the assembly and tried to tighten them down to dimple more, but I didn't want to strip anything, and it wasn't really going to work.

I’m going to research how people did this without #10 dies later.

No rivets set, but a good hour on the plane.

Prev | Next


Primed E-709 Root Rib Right

May 3, 2010

Prev | Next

Well, after a few days of no work, then a few more of yardwork, and a few more of more no work, I made it into the garage tonight for an hour of work. Now that summer is approaching, the garage is getting a little humid. I’m going to start thinking about buying a portable air conditioner.

Tonight’s main task was to get any piece of the right elevator ready for assembly. E-709 (Root rib right) seemed to be a good candidate.

On the right, my trusty scotchbrite pad. In the middle, E-709 (Root Rib right). On the left. Well. You may call that beer. I call it "delicious."

Anyway, after deburring and scuffing, I broke out the #40 tank dies (understructure, so I want the dimples slightly deeper) and did all but the aft two holes on top and bottom.

Dimpling.

For my hard to reach places, I use a steel bar with a countersunk hole in it, put the hole of interest on top, and put in a sacrificial rivet to use as a male dimple die. Then, I grab a flush set, and push the rivet into the hole in the steel.

Getting ready to ghetto-dimple.

Here’s a closeup of my steel bar for you to admire. The hole on the right is what I use for these tasks.

The hole on the left is useless, since I drilled it too far away from the edge of the bar. Dumb me.

Anyway, here’s a shot of one side of the E-709 after using this technique.

The bottom dimple is from the tank dies, the top two are with the rivet trick. Not perfect, but not bad for the hard-to-reach area. Based on my experiences on the rudder, the skin will sit just fine in these dimples.

Off to the paint-shop. And by paint-shop, I mean “a piece of cardboard on my trash and recycling bins.”

Up with the garage door for ventilation and on with the respirator before shooting the first coat.

While that dried, I snapped an action shot of me devinyling the inside of the skins. I also deburred all of the exterior sides of the recently drilled holes, but didn’t get to the insides, I’ll do that as soon as I get back into the shop.

Oh man, those stiffeners and rivets look nice.

Here are both interior sides done. (And by “done” I mean “done devinyling with just the parts I’m going to deburr, scuff, dimple, and prime.”) The rest of the vinyl will come off just before riveting, and will reveal nice untouched (and unprimed) alclad.

Pretty pretty.

Crap, I forgot to take a picture of me shooting primer on the other side of E-709, which is the entire basis for the title of today’s post. If you feel shortchanged, feel free to complain.

One hour.

Prev | Next


Right Elevator Stiffener Riveting

April 18, 2010

Prev | Next

A few days ago I got a little time in on the project. I’ll see if I can remember what happened. 3 hours, 116 rivets…2 of them drilled out and reset. Here we go. First thing, in preparation for stiffener riveting was to get the skin devinyled. Here’s my devinyling table, wooden stick (won’t dissapate heat) and permanent marker.

Ready to use the soldering iron to devinyl.

After devinyling the inside of the right elevator skin.

For some reason I like devinyling. Don't ask me why.

Here’s the outside of the skin after devinyling. This actually takes a long time to do.

I just devinyled the stiffener holes. I'll devinyl the rest after drilling to the skeleton.

At some point last weekend (can’t remember which day), I was sent to Home Depot (maybe Lowe’s…it was a busy day) to grab some gardening supplies. I took the opportunity to grab some indoor/outdoor carpet for the workbenches.

Here's what I call my toolbench with a new carpet surface.

You should be able to see the “workbench”‘ with carpet on it in future pictures. Anyway, I grabbed the skin and did some deburring (interior and exterior) and some scuffing (interior only, for priming).

Scuffed strip on the left, non-scuffed on the right.

After a few more minutes, I dimpled the skin (no pictures, sorry), and then decided they were ready for priming.

Where is that self-etching primer?

i got the picture order backwards, so you’ll see the skin primed later, but here I am getting ready (or just finishing) stiffener edge prep. I usually use my Permagit block to knock down any ridges, edge deburring tool (pictured below)  to chamfer both edges, and then a scotchbrite pad to smooth everything out.

Right elevator stiffeners and my edge deburring tool.

Here’s the picture of my primed skin.

It looks sloppy now, but wait until I get the vinyl off. Then the primed lines will look nice.

After the stiffener edge prep, the stiffeners got taken inside to be washed with dawn detergent.

Here are half of the stiffeners, being cleansed of their oily fingerprints and aluminum dust.

I decided to take a picture of how much detergent I use. Nothing really important, just camera-happy, I guess.

Dirty stiffeners need to be cleansed of their aluminum dust and fingerprints.

After cleaning, they go back outside for priming.

Boo-yeah, primed stiffeners.

While those were drying (and then flipped and sprayed on the other side), I placed rivets in the dimpled holes and taped them in place.

Rivets just asking to be beaten into submission.

I started to backrivet, and everything was going very smoothly.

Beautiful shop heads.

More beautiful shop heads.

God, I love backriveting.

But anyway, I got through all 116 rivets, then flipped everything over and saw these!

Ahh! Worst rivet ever!

This one is not so bad...

I figured out why this happened, and it falls squarely on me.

While I was dimpling, I didn’t pull the other half of the skin back well enough, so the skin side that was being dimpled was not sitting parallel to the faces of the dimple dies. One side of the die dented each of the last stiffener rivet holes on one side. The rivet in the second to last picture was flush against the backriveting plate, but the skin was dented, or above the backriveting plate.

I’m going to drill out all of the bad rivets on the trailing edge (of course, the worse of the bunch is on the top of the elevator, right where all of you are going to come look at my elevators), and then  try to smooth out the skin by backriveting it with a flush set from the inside out.

It might ruin the skins, which will be expensive. I’ll be sure to take some pictures of the process. Maybe it will save one of you some time and frustration…

Prev | Next


Right Elevator Stiffeners and Priming

April 12, 2010

Prev | Next

Today was pretty boring. All I did was trim the aft end of right elevator’s stiffeners and prime the two spar reinforcement plates.

Here's half of my right elevator stiffeners.

Of course, I finished deburring, edge finishing, and cleaning the two right elevator spar reinforcements. I even got the girlfriend involved. She took the parts inside and scrubbed them down with dawn. Now it really is “our” airplane.

Two spar reinforcements, primed on one side.

While that one side was drying, I finished up with the stiffener trimming. Here’s a shot of my weapon of choice.

Stiffeners and snips.

After I finished my first 7 stiffeners, I laid them into the skin, just for kicks.

Stiffener work is boring, but it means that there is backriveting coming soon, and I love backriveting.

Drink of choice tonight (only during piddly stuff, never during “real” construction): Rum and Coke. Mmm. Rum.

Rum. Coke. Stiffeners. Sharpie. And a damn dirty workbench. (Those splotches are ski-wax drippings.)

Anyway, I think it was an hour tonight, including the 5 minutes of double duty with the girlfriend’s help. I’m gonna get her to help more.

Prev | Next