More Right Flap Work

July 25, 2012

Prev | Next

Alright, another night in the workshop. And, tonight was a super-night. Not because I’m super-rv7-builder (I am), but because my cousin Taylor came over to learn about the airplane.

After a little talking, I put him to work.

First task, empty out the LP4-3s that just arrived from Van’s (my first airplane package in awhile) into one of my empty yellow bins.

Not off to a great start, Taylor.

He quickly started exceeding my expectations though. To get going on this flap, the next few steps are tedious, but the two of us working helped to lessen the pain.

We focused our attention on prepping the right flap lower skin deburring, dimpling, priming, etc.

Here’s the right flap lower skin. Not a really helpful picture. Oh well.

After showing him each of those “d” activities, We stuck the skin outside and proceeded with my new non-psycho masking prime job.

(If you remember from a few posts (months) back, I’m only going to do the straight-line vinyl trick with areas where someone can see. Parts that are closed off will get this treatment.)

Priming along the rivet lines.

Next up, the same trick on the interior ribs.

Deburr, dimple, scuff, clean, and prime.

It started to get dark out, and I needed the flash. Sorry.

Then, so we could end on a high note, we studied the plans a little, read the instructions (a novelty!) and started clecoing everything together to get a sense of how we should assemble this flap.

Here, the ribs and spar are clecoed to the lower skin to lock everything together.

It’s starting to look like an airplane!

Flipped over for some more clecoing.

We decided we could start by grabbing the four AN470AD4-4 rivets at the aft end of each interior rib.

Beautiful! (Stefan, look! another shop head!)

One of Taylor’s (damn, looks better than mine!)

Just to prove he was there, I took a picture of his toes. (And an airplane part.)

Since he was so productive and really saved me some time, I’m going to count his hours as straight hours.

2.0 hours (but logged as 4.0). 4 rivets.

I know 4 hours per week won’t be super speedy, but it’s a hell of a lot better than I did between January and July of this year.

Prev | Next


Tank Attach Nutplates, Left Lower Spar Flange

October 21, 2010

Prev | Next

With the girlfriend gone for the night, I managed to clean up all of the electrical stuff I had out messing around with my wig-wag experiment, and pulled the left spar out of the box. Here it is, in all of it’s golden glory.

Golden Glory!

First step is to countersink the tank (and access plate) nutplate attach holes. First, you have to run a #40 drill through the holes or else the countersink pilot won’t even fit in the hole. Here’s one of my first countersinks on the left spar.

I went back and cleaned this one up after testing with a AN426AD3-11 rivet (-11 because it's easier to get back out while testing countersinks...it's so long you can just push it back out from the back.)

These countersinks are a little better. (The one on the right is a tad deep, but should be okay because these are just nutplate attach holes.)

I left the door to the house open so the pups could come out to visit.

Hey guys (Jack and Ginger).

Hey Andrew, how about one of those artsy shots down the spar after countersinking the nutplate attach holes?

Sure, here you go.

Then, I pulled the K1100-08 nutplates out for the tank attach holes and the K1000-06 nutplates out for the access plate holes, then clecoed one side in, and put the required rivet (AN426AD3-4) in the holes.

Where’s my squeezer?

It's right there on the table, dummy.

Then I squeezed some rivets and removed the clecos.

Squeezed (repeated 41 more times.)

Other side done. (Repeated 41 more times.)

Under the hood, things look good. I still like this new Cleveland main squeeze much better than my economy squeezer.

Pretty shop heads.

Down the row.

I then laid the spar down and saw this guy.

Yikes.

Whoa. Scary.

After a little internet research, I think I’ve figured out he (actually she due to her size) is a red-back.  I’m going to keep looking though. I don’t want it to be a red-back.

1.0 hour. 84 rivets.

Prev | Next