I didn’t mean to spend a lot of time in the garage tonight, but I ended up spending about 2.5 hours.
The only thing left I have to do on the HS before getting the rear spar on is…finishing the rear spar. First thing, finish edge prep, then some more scotchbriting and finally cleaning in the kitchen (“get that airplane part out of the kitchen!”). Here are the parts ready to go inside for some cleaning. You can see the PermaGrit block I’ve been using to edge-finish.
While I was waiting for those to dry before priming, I pulled off the vinyl off one of the right HS interior bays where I had forgotten it from the other day.
Then, I scurried outside in the cold to prime the rear spar components (HS-603PPs and HS-609PPs), and came back inside to finish devinyling the other interior bay.
Then, after quick two-hour break for dinner and a couple TV shows, I went back outside after normal bedtime once I knew the rear spar parts had dried. Here they are clecoed together with the elevator center bearing (VA-146) and the hinge brackets.
Then I broke out the squeezer to squeeze some rivets. Why not?
This took most of the build time tonight. Here are some shop heads for your enjoyment. Not perfect, but they all pass the rivet gage test.
Then, I needed to bolt on the VA-146 center bearing. Time to go find some hardware. After a short search, I found the bolts (the correct ones are the short ones on the right).
Then I found the washers (the ones you are looking for are the thick ones). There were 24 of them in the bag. (Stop judging me for not putting all of my hardware in separate trays. Using the inventory sheet and the bags has worked well for me so far.)
Then I found the nuts. I didn’t torque anything down yet, just finger tight. Need to get some torque seal soon.
Alright, time to go inside, it’s getting late. Here are a few pictures of the final product tonight.

Nice and riveted rear spar. For those of who who don't have the plans in front of you, there are a couple sets of empty holes. They get riveted to the HS skeleton. I didn't forget anything, I promise.
A more artsy shot showing beautiful machined heads. I love the look of the rivets on the grey primer.
And one more shot, just because I can.
120 rivets set today. I’ll have to drill out a couple of the AN470AD4-5 rivets they have you set in the outboard hinge brackets. The instructions insist the rivet callouts on the plans is correct, but they seemed a little long. In a few cases, the shop heads cracked on a diagonal (I’ll try to get a picture of this tomorrow) so I’ll have to drill them out and replace them. Not bad, though. My riveting drill-out batting average decreased from 10% to 7.3% today. Good day!
For future reference, I finished up my second can of self-etching primer. I did prime the whole practice kit, but still, that is a lot of self-etching primer. I think on the next can, i am going to weigh the full can, then weigh the empty can. Then maybe I can make a rudimentary guess at the weight of primer I’ve used. (Ignoring the weight of the compressed gas in the container.)