It turns out, that for the last week, I’d been calling last Friday’s events “that time when the puppies mauled a pillow.”
I was wrong.
The official name, as of today, September 30, is “Feathergate 2011.”
It turns out, that for the last week, I’d been calling last Friday’s events “that time when the puppies mauled a pillow.”
I was wrong.
The official name, as of today, September 30, is “Feathergate 2011.”
This entry was posted on Friday, September 30th, 2011 at 11:30 pm and is filed under Wings. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
403.5 total build hours
6148 rivets set
643 rivets drilled out
9 parts reordered
1 figure-8 dimple
(as of Oct 15, 2018)
1) Fix rivets in right elevator
2) Trim right elevator weight
3) Clean up HS cuts
4) Look for underdriven rivets
5) REBUILD RUDDER :-(
6) Finish riveting right rear spar
7) Replace rivet on inboard rear spar edge
8) Start on left wing
9) FB tips on emp
10) Wingtips