I like this as a mounting location for something. I’m not sure OAT would be good here (the fiberglass is going to act like an oven in the heat), but something will go well here.
403.5 total build hours
6148 rivets set
643 rivets drilled out
9 parts reordered
1 figure-8 dimple
(as of Oct 15, 2018)
1) Fix rivets in right elevator
2) Trim right elevator weight
3) Clean up HS cuts
4) Look for underdriven rivets
5) REBUILD RUDDER :-(
6) Finish riveting right rear spar
7) Replace rivet on inboard rear spar edge
8) Start on left wing
9) FB tips on emp
10) Wingtips