Rolled Right Elevator Leading Edge

Prev | Next

How exciting! I get to roll the right elevator leading edge today!

Okay, if you couldn’t sense the sarcasm there, I’ll lay it out for you. I hate rolling leading edges.

This first section actually turned out nice after the roll. It was pretty easy to squeeze these together and rivet.

See? EasY!

Then, I took a picture of how I tape, which I have since ammended.

Now, I put tape along the entire edge, overlapping once piece with another.

Of course, since things started going badly, I forgot to take more pictures, but rest assured, I have some unintentional puckering between rivets on one of my rolled sections. The crappy thing is that once you roll and remove the pipe and tape, it is really hard to go back and re-roll.

Anyway, I moved on to installing the rod-end bearings.

Here is my rod-end bearing tool.

You can see how the rod-end just fits right in there. (The purpose of the tool is to help turn the rod-end in the nutplate without putting any pressure on the actual round bearing in the center.)

Tightening.

They want you to install the elevator rod-ends to 13/16″.

That's 13/16".

Right on the money.

After getting those in, I set the elevators aside and moved back to the trim tab. Here, I’m using wood backing (so the pilot of the countersink cutter has a good guide) and countersinking the holes on the top of the spar only (you can’t dimple the top, because the hinge sits just underneath the spar flange).

I'mi using a scrap piece of wood flooring here.

Then, it was time to dimple the skin. I only got the tab to a place where I can cleco it back together. I still have to fabricate some trim tab riblets.

Dimpled tab skin.

Then, I dragged the horizontal stabilizer out of the storage room and installed the elevators. Once I realized I had to drill out the hinge brackets to #12, the bolts went right in.

It looks like an airplane. And it's huge.

I’ll take more pictures of it for you sometime, but for now, I’m just going to leave this assembly on the workbench for a few days and admire it.

3 hours today.  22 more rivets.

Prev | Next

Leave a comment